Non IBR boiler: what the Boilers Act 2025 leaves out, and how to keep your hot water duties outside it
If you run a plant in India, you know what a registered boiler costs you: an attendant with a certificate on every shift, an annual shutdown for inspection, renewal fees, and paperwork that never quite stops. So when a hot water duty comes up, the first question is usually simple. Does this need IBR approval?
For a lot of hot water duties, the answer is no. This guide explains where the line sits under the Boilers Act 2025, what staying outside it saves you, and how a heat pump fits in as a non IBR hot water generator.
1. What the Act leaves out
The Boilers Act 2025 came into force on 1 May 2025 and repealed the Boilers Act 1923. Section 2(c) defines a boiler as a pressure vessel that generates steam for use outside itself. It then sets out three exclusions. Your vessel needs to meet only one of them to fall outside the Act.
| Exclusion | Measured as | On a plant |
|---|---|---|
| Capacity under 25 litres | From the feed check valve to the main steam stop valve | Very small packaged units |
| Design and working gauge pressure both under 1 kg/cm² | Both pressures | Open or low pressure circuits |
| Water heated below 100°C | Water temperature | Every hot water generator below 100°C, of any size |
The third exclusion matters most. It has no size limit, so it covers a 900 kW hot water plant just as it covers a small one.
The Directorate of Steam Boilers in Maharashtra describes the split in plain terms. Below 100°C, the unit is a hot water generator and needs no registration. Above 100°C, it is a steam generator and needs registration or an NOC.
There are two transition points to know about. Under Section 45, regulations made under the 1923 Act stayed in force until new ones were made, and existing registrations carried across. The Indian Boiler Regulations 2026 then took over from the 1950 regulations on 1 October 2026. For what that means for boilers you already have registered, see boiler inspection and renewal.
2. What staying outside saves
Here is what a registered boiler involves, using Maharashtra as the example:
- Staffing. A certificate holder must be in charge. Relief is limited to twice a day and two hours in total, and only by a first-class certificate holder. In practice, that means a qualified attendant on every shift, plus relief cover.
- Certificate to operate. It lasts 12 months at most. Renewal requires an inspection, which in turn means an annual shutdown.
- Bare inspection. The boiler has its lagging removed for inspection 10 years after manufacture, and again every 10 years after that.
- Fees. Registration costs ₹1,985 to ₹23,815, and annual renewal costs ₹1,765 to ₹20,950.
- Penalties. The 2025 Act keeps criminal penalties for offences that put life and property at risk, such as tampering with a safety valve.
None of these apply to a hot water generator running below 100°C. If you want to look at moving duties off steam altogether, read replacing steam with hot water.
3. Does a heat pump need IBR approval?
Not below 100°C. The Act looks at the vessel and the temperature of the water. It doesn’t care what supplies the heat, so a heat pump delivering water below 100°C is a non IBR hot water generator, the same as a gas-fired or electric one.
A small fired or electric non IBR unit is quick to buy and works well for an occasional load. For a duty that runs every shift, all three options are outside the Act, so running cost decides it.
Here is how they compare. The electricity price is MSEDCL HT-I (11 to 33 kV): ₹8.44 plus ₹0.81 wheeling, which comes to ₹9.25/kVAh.
| Generator | Price | ₹ per useful kWh |
|---|---|---|
| Commercial LPG, 19 kg Indane, Mumbai | ₹2,775/cylinder, 1 Nov 2026 | 12.42 |
| Electric element, 97% | ₹9.25/kVAh, FY2026-27 | 9.54 |
| PNG, MGL Industrial A | ₹86.79/SCM, Nov 2026 | 9.24 |
| Furnace oil | ₹71.99/kg, 1 Aug 2026 | 7.70 |
| Tetra Heat Pump, COP 2.5 | ₹9.25/kVAh | 3.70 |
| Tetra Heat Pump, COP 3.0 | ₹9.25/kVAh | 3.08 |
COP 2.5 and 3.0 are illustrations for an 85 to 90°C loop, and they leave some margin. For comparison, Tetra Heat Pump water source units are rated at a COP of 4.5 to 5.2 at 60°C output, and independent measurement in India gives about 2.26 at 110°C.
Assumptions: 860 kcal/kWh; LPG 11,900 kcal/kg; gas 9,500 kcal/SCM; furnace oil 10,050 kcal/kg; efficiency 85% for gas and LPG and 80% for oil; 1 kVAh = 1 kWh. At a power factor of 0.9, the electric rows come out about 11% higher.
For more detail, see our pages on the hot water generator, industrial fuel prices in India and industrial electricity tariffs in India.
If you burn coal or briquettes, the heat pump will cost more to run on grid power. Plants that switch anyway do it for other reasons: compliance, stack emissions and labour.
4. Duties that run below 100°C
Many plants run one steam header for every load. That means hot water duties that never needed steam are still sitting on a registered boiler. These are the common ones:
| Duty | Temperature | Example |
|---|---|---|
| Dairy pasteuriser loop | 85 to 90°C | 900 kW dairy using refrigeration heat recovery (case study) |
| CIP caustic | 70 to 85°C | Within range |
| Alkaline degrease | 55 to 80°C | 1.5 MW automotive paint shop: duty energy cost down 65%, payback in 18 months (case study) |
| Zinc phosphating | 50 to 60°C | Same paint shop |
| Hotel guest hot water; laundry | 45 to 70°C; 60 to 85°C | 200-room resort: heating cost down 70% (case study) |
| Washing and cleaning water | 40 to 60°C | Within range |
Each of these can run as a non IBR duty.
5. Above 100°C
Above 100°C, your State Boiler Directorate decides. Tetra Heat Pump delivers up to 120°C, so this range needs care.
Water at 120°C has a saturation pressure of about 1 kg/cm² gauge, so the circuit has to be pressurised above that to stop it flashing. On a plain reading of section 2(c), a vessel of 25 litres or more on that circuit could count as a boiler. We haven’t found a published ruling either way. The Act does let a state exempt, by notification, boilers used only for heating buildings or supplying hot water.
For a 100 to 120°C circuit, get a written view from the Directorate before the design is fixed. We’ll provide the vessel volumes, design pressure and temperatures you need for the application.
If a process needs saturated steam under pressure, such as a 121°C retort or an autoclave, the boiler stays registered and a heat pump is the wrong machine for that duty. It can still take the hot water duties off that boiler, or preheat its feed water.
6. How Tetra takes a duty outside the Act
The approach is to deliver below 100°C wherever the process allows it.
Take the dairy. Its pasteuriser holds the product at 72 to 75°C, so the heating loop only needs 85 to 90°C. A Tetra Heat Pump supplies 900 kW to that loop from heat the refrigeration plant was already rejecting. It connects through an exchanger, nothing changes on the product side, and no registration is needed.
On a survey, we:
- list each duty and the temperature it actually needs
- mark which of them can run below 100°C
- look for a warm stream on site to use as the heat source, because a smaller temperature lift gives a better COP
Your existing boiler doesn’t have to go. It can sit on standby at its set point, controlled through your BMS, SCADA or PLC (see integration). As long as it serves any steam duty, it stays registered.
Tetra Heat Pump is made by Promethean Energy and goes up to 1,450 kW per unit. It is already running below 100°C in a dairy, a paint shop and a hotel.
7. What to send us
To work out which of your duties can move outside the Act, send us:
- each hot water and steam duty, with the temperature the process needs
- the flow (litres per hour or daily volume) and the operating hours
- your boiler’s pressure and fuel, plus 12 months of fuel bills
- your electricity bill, showing tariff category and sanctioned demand
- any warm streams on site, such as chiller condenser water or compressor cooling water, with their temperatures
We’ll come back with which duties can go outside the Act on a heat pump, the machine size, and the running cost compared with your current boiler.
Frequently asked questions
- What is a non IBR boiler?
- It is a vessel the Boilers Act 2025 does not count as a boiler. Section 2(c) leaves out three kinds: a vessel under 25 litres, measured from the feed check valve to the main steam stop valve; one whose design and working gauge pressure are both under 1 kg/cm²; and one that heats water below 100°C. Meeting any one of them is enough.
- Does a hot water generator below 100°C need IBR registration?
- No. Water heated below 100°C is one of the Act's exclusions, and it has no size limit, so it covers a 900 kW hot water plant as well as a small one. The Directorate of Steam Boilers in Maharashtra calls equipment below 100°C a hot water generator that needs no registration. Above 100°C it is a steam generator and needs registration or an NOC.
- Does a heat pump need IBR approval?
- Not below 100°C. The Act looks at the vessel and the temperature of the water, not at what supplies the heat, so a heat pump delivering water below 100°C is treated the same as a gas-fired or electric hot water generator. Tetra Heat Pump goes up to 120°C, and above 100°C your State Boiler Directorate decides, so get a written view from them before the design is fixed.
- What does a registered boiler need that a non IBR unit does not?
- In Maharashtra, a certificate holder in charge on every shift, with relief only twice a day and two hours in total, by a first-class certificate holder. A certificate to operate that lasts 12 months at most, so an inspection and a shutdown every year. A bare inspection 10 years after manufacture and every 10 years after that. Registration fees of ₹1,985 to ₹23,815 and renewal fees of ₹1,765 to ₹20,950 a year. A hot water generator below 100°C needs none of these.
- Which plant duties can run below 100°C?
- Common ones are the dairy pasteuriser loop at 85 to 90°C, CIP caustic at 70 to 85°C, alkaline degrease at 55 to 80°C, zinc phosphating at 50 to 60°C, hotel guest hot water at 45 to 70°C, laundry at 60 to 85°C, and washing and cleaning water at 40 to 60°C. In many plants these still sit on a registered boiler because one steam header serves every load.