Industrial electricity tariffs in India for 2026-27: Maharashtra, Gujarat, Tamil Nadu, Karnataka and Uttar Pradesh, and the COP a heat pump needs in each

Tariffs checked against each regulator's order on 24 November 2026. Updated whenever a state issues a new order.

An engineering control desk with an energy monitoring screen and drawings, looking out over a factory process floor
The energy charge is printed on the tariff order; what you actually pay per unit is on your own bill

If you are weighing a heat pump against a boiler, the first number you need is your electricity price per unit. A heat pump's running cost is simply your landed tariff divided by its COP. Everything else on this page follows from that.

Below are the FY2026-27 HT industrial tariffs for Maharashtra, Gujarat, Tamil Nadu, Karnataka and Uttar Pradesh, with notes on how each state bills. After that we show the breakeven COP against every common boiler fuel, and what happens to the sums if a heat pump adds to your demand charge.

₹9.25

per kVAh, Maharashtra HT-I at 11 to 33 kV, with wheeling, 2026-27

₹6.71 to ₹7.50

per unit in Gujarat, Tamil Nadu, Karnataka and UP HV-2

0.56 to 1.28

breakeven COP against LPG, LDO, furnace oil and industrial PNG

₹10.28

per kWh in Maharashtra at a power factor of 0.9

Industrial electricity tariffs by state, FY2026-27

State, DISCOM Category Energy charge Demand charge Added per unit Per unit before demand + duty Source
Maharashtra, MSEDCL HT-I(A) Industry ₹8.44/kVAh ₹650/kVA/month Wheeling ₹0.81/kVAh at 11 to 33 kV; nil at EHV ₹9.25/kVAh MERC order, 25 Mar 2026
Gujarat, DGVCL, MGVCL, PGVCL, UGVCL HTP-I ₹4.00 to ₹4.30/unit by billing demand ₹150 to ₹475/kVA/month in slabs FPPAS ₹2.45/unit + 3.99% variable ₹6.71 to ₹7.02/unit GERC schedule; GUVNL circular
Tamil Nadu, TNPDCL HT-I Industries ₹7.50/kWh ₹608/kVA/month None published ₹7.50/kWh TNERC T.O. 6 of 2025
Karnataka, BESCOM + ESCOMs HT-2(a) Industrial ₹6.70/kWh ₹365/kVA/month 35 paise surcharge ₹7.05/kWh KERC review order, 3 Mar 2026
Uttar Pradesh, UPPCL HV-2 Large and Heavy Power, up to 11 kV ₹7.10/kVAh ₹300/kVA/month Regulatory surcharge as notified ₹7.10/kVAh UPPCL rate schedule FY2026-27
Uttar Pradesh, UPPCL LMV-6 Small and Medium Power ₹7.30/kWh ₹290/kW/month Regulatory surcharge ₹7.30/kWh Same

The last column is the energy charge plus any per-unit adders. Demand charge, time-of-day adjustments and electricity duty come on top, so your true landed rate is on your own bill. The column still gives a fair point of comparison. At any of these rates, a heat pump with a COP above 1.28 beats an LPG, LDO, furnace oil or industrial PNG boiler.

Industrial electricity tariff in Maharashtra

MERC's multi-year order of 25 March 2026 sets the HT-I(A) energy charge at ₹8.44/kVAh for FY2026-27. It then steps down each year to ₹7.45 by FY2029-30, so heat pump economics in Maharashtra get better over the life of the machine. The demand charge is ₹650/kVA/month.

Plants that connect at 11, 22 or 33 kV pay ₹0.81/kVAh wheeling on top, which makes ₹9.25/kVAh. Only EHV consumers pay the bare ₹8.44. Once demand charges are spread over units, MERC's approved average billing rate for HT industry is ₹10.71/unit.

kVAh billing and power factor

Maharashtra has billed HT consumers in kVAh since 2020. That means a poor power factor costs you money directly. At a PF of 0.9, the ₹9.25 you pay per kVAh works out to about ₹10.28 per kWh of real power.

This catches a lot of plants. Around a quarter of Maharashtra consumers above 200 kVA run below PF 0.90, and a large compressor makes it worse. When we size a heat pump we size an APFC panel alongside it. On some sites the power factor saving pays for part of the installation.

Time of day

MSEDCL gives a rebate on power drawn during solar hours, 09:00 to 17:00: 15% from April to September and 25% from October to March. Evening use from 17:00 to 24:00 costs 20% extra. A heat pump that charges a hot water store during the day runs mostly on rebated power and avoids the evening premium completely.

If you are near your sanctioned load, read sanctioned load and heat pump retrofits before you size anything.

Gujarat HTP-I tariff

GERC's schedule from 1 April 2026 sets the HTP-I energy charge by billing demand:

  • ₹4.00/unit up to 500 kVA
  • ₹4.20/unit from 500 to 2,500 kVA
  • ₹4.30/unit above 2,500 kVA

Demand charges are slabbed: ₹150/kVA for the first 500 kVA, ₹260 for the next 500, and ₹475 above 1,000 kVA.

The low energy charge is not what you pay, though. From July 2026, GUVNL adds a base FPPAS of ₹2.45/unit plus a variable 3.99% on the energy charge, the base FPPAS and the demand charge. Above 2,500 kVA that comes to (₹4.30 + ₹2.45) × 1.0399 = about ₹7.02/unit. Below 500 kVA it is ₹6.71.

Gujarat's time-of-day structure also favours daytime heating. Peak hours (07:00 to 11:00 and 18:00 to 22:00) cost 45 to 85 paise more per unit, and 11:00 to 17:00 is 60 paise cheaper.

Tamil Nadu, Karnataka and Uttar Pradesh

Tamil Nadu

TNERC's T.O. 6 of 2025 set HT-I Industries at ₹7.50/kWh and ₹608/kVA/month from 1 July 2025. The order allows an inflation-linked revision from 1 July 2026. TNERC had not listed a revised order when we last checked, so these rates still apply. Peak hours (06:00 to 10:00 and 18:00 to 22:00) carry a 25% surcharge, and night use from 22:00 to 05:00 gets 5% off. Electricity tax is 5%.

Karnataka

KERC's review order of 3 March 2026 puts HT-2(a) at ₹6.70/kWh and ₹365/kVA. The 2025 order had scheduled ₹6.60 and ₹350 for this year, so check which figures your bill actually uses. With the 35 paise surcharge, the per-unit rate is about ₹7.05. BESCOM is also collecting "FY25 True up Charges" from May 2026 to April 2027, based on each consumer's 2024-25 consumption. From December to June, power costs ₹1/unit more from 06:00 to 09:00 and 18:00 to 22:00, and ₹1 less from 22:00 to 06:00.

Uttar Pradesh

LMV-6 is for small and medium power: ₹7.30/kWh plus ₹290/kW/month, with an average billing rate of ₹9.02/unit. Large HT plants fall under HV-2 up to 11 kV: ₹7.10/kVAh and ₹300/kVA, billed in kVAh like Maharashtra. Both carry a ±15% time-of-day adjustment.

Heat pump breakeven COP by state

The breakeven COP is your electricity price per kWh divided by what your current fuel costs per useful kWh of heat. If your heat pump's COP is above that number, it is cheaper to run than the boiler.

Our assumptions: 860 kcal per kWh; gas at 9,500 kcal/SCM; furnace oil at 10,050 kcal/kg; LPG at 11,900 kcal/kg. We use boiler efficiencies of 85% for gas and LPG, 80% for oil, and 70 to 72% for solid fuel. Current fuel prices are on our industrial fuel prices in India page.

Fuel, ₹ per useful kWh MH ₹9.25GJ ₹7.02TN ₹7.50KA ₹7.05UP ₹7.10
Commercial LPG, Mumbai: 12.42 0.740.570.600.570.57
LDO: 12.58 0.740.560.600.560.56
PNG, MGL Industrial A: 9.24 1.000.760.810.760.77
PNG, MGL Industrial B: 7.96 1.160.880.940.890.89
Furnace oil: 7.70 1.200.910.970.920.92
PNG, Gujarat: 7.24 1.280.971.040.970.98
PNG at pre-crisis ₹41.60/SCM: 4.43 2.091.581.691.591.60
Briquette: 2.54 3.642.762.952.782.80
Coal delivered at ₹6,000/t: 1.94 4.773.623.873.633.66

As an example, take Maharashtra against furnace oil: ₹9.25 ÷ ₹7.70 = 1.20. (We treat 1 kVAh as 1 kWh here. If your PF is poor, fix that first.) The UP column uses HV-2 at 11 kV.

The table splits into three groups:

LPG, LDO, furnace oil and PNG: breakeven 0.56 to 1.28. Any working heat pump wins. Our water-source machines reach COP 4.5 to 5.2 at 60°C output. Even at 120°C, where independent tests in India put COP at about 2.0, they still clear every number in this group.

Gas at pre-crisis prices: breakeven 1.58 to 2.09. The heat pump still wins comfortably at hot water temperatures.

Briquette and coal: breakeven 2.76 to 4.77. On running cost alone, a heat pump on grid power costs more here. The case for switching rests on compliance, stack emissions and the labour of handling solid fuel. A partial step such as boiler feed water preheating is often the place to start.

When the demand charge matters

A demand charge only affects the sums if the heat pump raises your billing demand. If it does, spread the extra charge over the units the heat pump uses.

Say a heat pump adds 100 kVA and runs 500 hours a month, using about 50,000 kWh. In Maharashtra that adds ₹65,000 a month, or about ₹1.30 per unit. In Tamil Nadu it adds ₹1.22, in Gujarat (above 1,000 kVA) ₹0.95, in Karnataka ₹0.73, and in UP ₹0.60.

Now take the worst case: Maharashtra, full demand charge, running at 120°C with a COP of 2.0. That works out to (₹9.25 + ₹1.30) ÷ 2.0 = about ₹5.28 per useful kWh. That is still well below furnace oil at ₹7.70 or MGL Industrial A gas at ₹9.24.

You can usually avoid the extra charge altogether. Run the heat pump within your existing contract demand, and charge a hot water store when the rest of the plant is light. At a 200-room resort we worked on, storage volume was as much a sizing decision as heat pump kW, and heating cost came down 70%. See the hotel hot water case study.

What plants have saved

Tetra Heat Pump, made by Promethean Energy, delivers heat up to 120°C and has more than 200 installations. A few results:

  • A 1.5 MW automotive paint shop moved its alkaline degrease (55 to 80°C), zinc phosphating (50 to 60°C) and hot rinses off fuel-fired heating. The energy cost of that duty fell 65%, with an 18-month payback. Read the paint shop case study.
  • A 900 kW dairy runs an 85 to 90°C loop from heat its refrigeration plant used to reject. Read the dairy case study.

Where a heat pump replaces gas, LPG, furnace oil, LDO or diesel, heating cost typically falls 40 to 70%. Where you land in that range depends on your tariff, your fuel price and the output temperature you need. For what drives the machine price, see industrial heat pump cost in India.

Frequently asked questions

What is the industrial electricity tariff in Maharashtra for 2026-27?
For HT-I(A) industry, MERC's order of 25 March 2026 sets the energy charge at ₹8.44/kVAh and the demand charge at ₹650/kVA a month. If you connect at 11, 22 or 33 kV, you also pay ₹0.81/kVAh wheeling, so your rate is ₹9.25/kVAh. Only EHV consumers pay the bare ₹8.44. Time-of-day adjustments and electricity duty come on top.
Why does kVAh billing matter in Maharashtra?
Maharashtra has billed HT consumers in kVAh since 2020, so a poor power factor costs you money directly. At a PF of 0.9, the ₹9.25 you pay per kVAh works out to about ₹10.28 per kWh of real power. That is why we size an APFC panel alongside the heat pump, and on some sites the power factor saving pays for part of the installation.
What is the HTP-I tariff in Gujarat?
Under GERC's schedule from 1 April 2026, the energy charge is ₹4.00 to ₹4.30/unit depending on your billing demand. From July 2026, GUVNL adds a base FPPAS of ₹2.45/unit plus a variable 3.99%. That brings the per-unit rate to about ₹6.71 below 500 kVA and about ₹7.02 above 2,500 kVA, before demand charge and duty.
Is UPPCL's LMV-6 the right tariff for a large plant?
No. LMV-6 is for small and medium power: ₹7.30/kWh plus ₹290/kW a month. Large HT plants fall under HV-2, which up to 11 kV is ₹7.10/kVAh and ₹300/kVA a month, billed in kVAh like Maharashtra.
What COP does a heat pump need to beat my boiler?
Divide your electricity price per kWh by what your fuel costs per useful kWh of heat. On these 2026-27 tariffs the answer is 0.56 to 1.28 against LPG, LDO, furnace oil and industrial PNG, so any working heat pump wins, even at 120°C where COP drops to about 2.0. Against briquette and coal it is 2.76 to 4.77, and there a heat pump on grid power costs more to run.

Work out your own numbers

The tariffs above are a starting point, but your bill is the real number. The heat pump calculator takes your landed tariff, fuel price, output temperature and operating hours, and gives you a yearly running cost for both the boiler and the heat pump.

Or send us your latest electricity bill and a fuel invoice through get started. We'll work out your breakeven COP and the saving on your own tariff, including demand charge, time of day and power factor.